What Your Builder Needs from you ( and what the heck is First-Fix?)

Click on image to listen now

Many renovation disasters don't start on site. They start months earlier, at the kitchen table, with a brief for the builder that never gets finished.

Marc Reardon, President of FMB Cymru and founder of Pearwood Projects, tells Lesley Taylor what a builder needs from you, when he needs it, and what it costs when communication between client and builder breaks down. If you're about to get builders' quotes, or you've had them back and can't see why one is so much higher, listen to this before you decide.

IN THIS EPISODE

- Why you should check your builder is an FMB member, and what that vetting covers

- What a bill of quantities is, and why quotes without one are never like for like

- PC sums: why low ones make a quote look cheaper and cost you later

- Why moving one socket after the walls are up means bringing back the plasterer, the carpenter and the electrician

- Lead times, and what to think about before you supply your own materials

- Why you should tell your builder your real budget

- The £40,000 steel price rise that shows why you need a contingency


THE BUILD, IN ORDER

Footings, then blockwork up to damp-proof course and the ground floor slab. Walls up to joist level, then the next storey. Once it's watertight, first fix plumbing and electrics, then insulation, plasterboard and plastering. Then decoration, second fix (taps, sanitaryware, faceplates), a final clean and handover.


TIMESTAMPS

00:00 Why renovation disasters start at the kitchen table

01:14 Seeing it from both sides: Pearwood Projects and FMB Cymru

02:15 Why you should check your builder is an FMB member

03:09 First fix, and why some finish decisions come so early

04:05 What a builder wants from you to price your project

04:39 Bill of quantities vs scope of work

06:02 Why changes on site cost so much

07:47 How to compare three quotes like for like

08:53 PC sums, and why low ones catch you out

09:53 The labour cost of herringbone, mosaics and large-format tiles

10:56 Do the design thinking before your builder asks

12:54 Why you should be honest about your budget

14:18 Lead times and procurement schedules

15:22 Supplying your own materials: storage, waste and returns

18:54 The ups and downs, and the cost in the ground

20:20 How to read your architect's plans

22:16 The build, from footings to handover

23:42 Why online prices aren't what they seem

26:34 Get your builder in early

26:50 Why tender prices come back over budget

29:30 Decisions made on site always cost more

29:54 Bring your interior designer in early too

32:46 The Before You Buy the Sofa Six

33:39 What Marc would do first: vet your builder

34:45 The costs no one can control, and why you need a contingency

36:44 What homeowners misunderstand about a builder's job

38:34 How a builder knows he's got it right

39:07 The one thing to know before you start


ABOUT MARC

Marc Reardon is founder and director of Pearwood Projects, a high-end residential construction company in South Wales, and chairman of FMB Cymru, the Federation of Master Builders in Wales.

Pearwood Projects: https://pearwoodprojects.co.uk

Federation of Master Builders: https://www.fmb.org.uk


ABOUT LESLEY

Lesley Taylor is an interior designer with more than 30 years' experience across high-end homes and boutique hotels. She has written 10 books on interior design, appeared on BBC and ITV as an interior design expert, and hosted interior design courses around the UK for a leading interior design magazine.


NEXT

Episode 3 is out now: stylist Kerry Lockwood on why a room can still feel unfinished. Episode 4, with fabric and wallpaper designer Charlotte Gaisford, is out on Thursday 26 November.

Get each new episode in your inbox: https://beforeyoubuythesofa.mykajabi.com/episodes

Follow @beforeyoubuythesofa on Instagram for behind-the-scenes extras from each episode, plus more interior design tips.

Previous
Previous

Why The Sofa Comes Last…

Next
Next

Trailer